Walk through how Pyonair turns a bill of materials and your site rules into a costed estimate in seconds. Use Next and Back, or the step bar, to move through it. Every figure is a sample estimate computed in real time from your inputs, not a committed quote. This demo is narrated, so turn your sound on to hear each step.
6 steps · 🔊 narrated · sample estimate
INSTANT QUOTING ENGINE× PYONAIR
Pyonair · Quoting Demo · Sample estimate
Pick a Build
Start with the build. Pick a sample program to see an estimate computed in real time.
Four sample builds span aerospace, data center, communications and industrial. The engine reads the real line items and computes the estimate in real time.
Each sample carries its own default rules (margin, complexity, station, throughput). You can change every one of them on the next step.
Build input
sample scenarios
OR BRING YOUR OWN BOM
⇩
Drop or choose a CSV / XLSX BOM file
Drag in your BOM (.csv or .xlsx) or paste a BOM list below.
Set the Rules
Set the rules for the job. These are the levers that move a real quote.
Parts count, board complexity, the assembly station, labor rate and model, facility cost, order quantity, margin, terms and landed cost. Every rule is editable and the estimate recomputes instantly.
Estimated total
—
Generate on the next step, then come back and move any rule. The estimate recomputes instantly from your numbers. A sample estimate, not a committed quote.
Rules engine
every value below is a rule you set
Fully configurable to your site. Every rule below is editable and the quote recomputes instantly. This is a starting rule set, not a fixed one; train it on exactly how you cost a job.
Board & parts
94
Standard
Populate both sides (flip / second placement pass)
Machine & labor
MyData
Each machine sets its own base assembly time per board (hrs/board). Add your own line and it appears in the list.
$85
Simple
Simple uses the hourly rate above. Detailed breaks labor into operation buckets, each with its own hours and rate, plus a shift multiplier and board complexity.
Labor by operation (Detailed)
Day 1.0x
1.00x
Multiplies every operation's labor (research-grounded complexity factor).
North America
Each site carries its own operation rates, overhead and yield (cost per GOOD unit). Picking a named site auto-fills the operation rates below; they stay editable.
35%
0.97
Yield-adjusted labor = (labor + overhead) / FPY = cost per GOOD unit. FPY must be in (0,1].
Rate-card CSV with operation,rate columns sets this site to Custom and loads its rates.
Operation
Hours/unit
Rate $/hr
Shift override
CSV with operation,rate columns populates the rate fields.
Facility & throughput
0.35
$28
100
40
Throughput sets machine access-time: slower lines hold the machine longer per board, raising the run cost.
Commercial
32%
Net 30
EXW
The Incoterm determines which landed-cost lines are inside the quoted price vs. a buyer add-on. Risk-transfer point can differ from the cost-transfer point.
Landed cost (sample defaults)
18,000
2.5%
Duties are a rate applied to the customs value (driven by HS code and country of origin), not a flat fee. Sample default.
3,500
1,200
900
Freight, duty, insurance, brokerage and handling are suggested sample defaults, editable per shipment.
Generate
The engine reads the BOM, counts the parts, checks every line, and costs the build in seconds.
Parse the lines, classify passive versus active, check Vishay and TI for stock and price, then cost the components and the build under your rules.
Runs on the selected build with your current rules. Re-run any time after changing a rule.
Real-Time Analysis
Waiting
Press Generate to watch the engine read the build, count the components, check each part against Vishay and TI, then cost the parts and the build.
Build Analysis
BOM and Parts Cost
Every line item, priced. Components cost per unit, then across the order.
Each part carries its distributor, unit price and extended cost. Unit prices are suggested catalog figures, not a committed quote; they firm up against actual distributor quotes.
Sample estimate, not a committed quote.
Components / Parts Cost
Build and Assembly
The build cost, rule by rule: setup, placement, test and facility.
Every value is a rule you set, shown with its basis. Below it, labor by site shows which plant builds it cheapest on yield-adjusted labor.
Sample estimate, not a committed quote.
Build / Assembly Cost
Labor by Site (which plant builds it cheapest)
Advanced: site pre-filter (capability matrix and capacity snapshot)
Sample Estimate
A sample estimate, computed from your inputs. Not a committed quote.
Total and per unit, landed cost by Incoterm, terms, print and export. When you want a real quote built with you, the Pyonair team takes it from there.
Sample estimate, not a committed quote.
Estimated total
Estimated per unit
Sample Estimate
Pyonair Instant Quoting Engine. Pricing preliminary, subject to engineering and BOM review.